Skip to main content

Sub-chapter 6.9.3 “Requirements for design, construction, inspection and testing of fibre reinforced plastic (FRP) service equipment for portable tanks” and amendments to Sub-chapters 6.7.2.5.11, 6.9.1 and 6.9.2.5 (Russian Federation)